Description
Water Well Nos. 3 and 13 are currently out-of-service due to a significant loss of pumping capability. Water Well Nos. 3 and 13 showed indications of significant production decline in March 2025 and June 2024 respectively and both were shut off soon once their production fell below 250 gpm (the well pumps are designed to produce 1,300 gpm and 1,500 gpm respectively). Due to the failure of the well pumps, both wells will be rehabilitated and their pumping equipment replaced.
Project Information
Contract Award Date (Design): N/A – Design In-House by SJRA
Consultant: N/A – Design In-House by SJRA
Village: Grogan’s Mill-WW No. 3 and Alden Bridge-WW No. 13
MUD: 6-WW No. 3 and 47-WW No. 13
Status & Schedule
Project Design: March 2025-September 2025
Anticipated Project Start (Construction): January 2026
Dates are subject to change.