Description

Water Well Nos. 3 and 13 are currently out-of-service due to a significant loss of pumping capability. Water Well Nos. 3 and 13 showed indications of significant production decline in March 2025 and June 2024 respectively and both were shut off soon once their production fell below 250 gpm (the well pumps are designed to produce 1,300 gpm and 1,500 gpm respectively). Due to the failure of the well pumps, both wells will be rehabilitated and their pumping equipment replaced.

Map - WW 3 and 13 Rehab

Project Information

Contract Award Date (Design): N/A – Design In-House by SJRA

Consultant: N/A – Design In-House by SJRA

Village: Grogan’s Mill-WW No. 3 and Alden Bridge-WW No. 13

MUD: 6-WW No. 3 and 47-WW No. 13

WW 3 and 13 Rehab

Status & Schedule

Project Design: March 2025-September 2025

Anticipated Project Start (Construction): January 2026

Dates are subject to change.