Water Plant Nos. 1, 2 and 3 are three of the five water plants owned and operated by the San Jacinto River Authority (SJRA) in The Woodlands. At all five groundwater plants, groundwater from SJRA-owned groundwater wells is collected and blended with surface water from SJRA’s GRP Division surface water plant at Lake Conroe. Each water plant provides a vital role in the blending, chlorination, and pumping out into the distribution system to serve customers of The Woodlands. To continue operational reliability of each water plant during a power outage situation, backup power generation is necessary to power on-site groundwater wells and/or plant booster pumps to maintain minimum required system pressure and flow rate. At Water Plant Nos. 2 and 3, a 1-MW generator will be installed to power controls and a combination of on-site water wells and booster pumps. At Water Plant No. 1, a 450-kW generator will be installed which will be moved from Water Plant No. 3. This construction contract also includes electrical site-work, and the installation of a concrete masonry unit (CMU) building to house the automatic transfer switch and switchboard at all three locations.
Project Information
Contract Award Date (Design): October 2022
Consultant: Kalluri Group, Inc.
Contract Award Date (Construction): July 2024
Contractor: C3 Constructors
Village: Grogan’s Mill – WP1; Cochran’s Crossing – WP2; Village of Alden Bridge – WP3
MUD: 36 – WP1; 47 – WP2 and WP3
Status & Schedule
Project Design: November 2022–August 2023
Project Construction: August 2024–October 2025
Dates are subject to change.