The Wastewater Strategic Plan will consist of a high-level feasibility study to evaluate options for consolidating the existing wastewater collection and treatment system and compare those options to a baseline scenario of replacing the existing infrastructure based on its service life. SJRA will coordinate with the MUD Boards to determine if a more detailed and comprehensive study (Phase 2) is needed based upon the results of Phase 1. If the MUD Boards elect to proceed with consolidation, SJRA may then initiate Phase 2 of the study to develop a master plan for the collection system and treatment facility improvements required to consolidate the system.

Map_WO1_FNI_WWConsolidation

Project Information

Contractor: Freese and Nichols

Wastewater Strategic Plan Map

Status & Schedule

Contractor Notice to Proceed: November 2021

Final Feasibility Study Date: January 2023

Dates are subject to change.